Motion 05.13.08 River Rd. Repair
|
|
OFFICE OF THE CITY MANAGER
CITY HALL
TELE: (978) 970-4000
FAX: (978) 970-4007
Bernard
F. Lynch
City
Manager
TO: Mayor Edward “Bud” Caulfield
And
Members
of the
FROM: Bernard F. Lynch, City Manager
DATE: June 6, 2008
SUBJECT: CC
Motion of 08.05.13 BY C.R. Mercier
“Request the Manager have the
street dept. repave/repair a section of
In regards to the above-mentioned motion, TJ McCarthy, Assistant Manager/DPW Operations and the Engineering Department have worked together to determine the cost and scope of having this section of road repaired and/or repaved. The cost to repair this section of road is estimated at $40,000. As the street is unaccepted by the City, it would be ineligible for repair through Chapter 90 funds.
The Engineer’s Division has been instructed to immediately begin the process of accepting the street, and the LPWD will list this repair in a future road repair capital funding request.
Thank you.
