Construction Projects

The City of Lowell is committed to maintaining and improving its infrastructure to better serve residents, businesses, and visitors. This page provides an overview of construction projects that enhance roadways, sidewalks, drainage systems, and other public infrastructure. 

Curious Where These Projects Are Happening?


View the project location map to see where construction is taking place across the city.

 Click here to view the map

For more information about each project, use the links provided below to access specific details.

City of Lowell Projects 

The list below is subject to change based on the availability of funding, weather conditions, permitting and coordination requirements, contractor scheduling, and other unforeseen circumstances. The page was last updated in January 2026. Information is posted as it becomes available and may be revised as project details are confirmed.

  1. 2026 Construction Projects
  2. Completed Construction Projects

MassDOT Projects

Below is a list of MassDOT projects that are currently ongoing or scheduled to take place in the City of Lowell. For more detailed information, please visit the Massachusetts Department of Transportation website, or contact MassDOT directly. Additional project updates and resources are also available on the MassDOT Project Information page.

DOT Project IDProject Description Project TypeStatus
Start Date/End Date
605966LOWELL- RECONSTRUCTION & RELATED WORK ON VFW HIGHWAYRoadway ModernizationConstruction 
612549LOWELL- PAWTUCKET STREET CORRIDOR IMPROVEMENTSRoadway ModernizationDesign 
609050LOWELL- CHURCH STREET 2-WAY CONVERSIONRoadway ModernizationDesign
604694LOWELL- CONNECTOR RECONSTRUCTION, FROM THORNDIKE STREET TO GORHAM STREETRoadway Modernization25% Design Plans
613709LOWELL- CONCRETE PAVEMENT REHABILITATION ON ROUTE 133 (ANDOVER STREET)Pavement PreservationDesign
608816LOWELL- DRACUT- METHUEN- RESURFACING AND RELATED WORK ON ROUTE 110Resurfacing DOT Owned Non-InterstateConstruction
613729LOWELL- SCHOOL STREET IMPROVEMENTS AT STOKLOSA MIDDLE SCHOOL (SRTS)Roadway - Reconstruction - Sidewalks and CurbingDesign
609206LOWELL- DOWNTOWN CANALWAY PEDESTRIAN IMPROVEMENTS & PAWTUCKET CANAL BRIDGE IMPROVEMENTSHighway Reconstruction and RehabDesign 
607887LOWELL- ROURKE BRIDGE REPLACEMENT, L-15-088, WITH NEW BRIDGE, L-15-114, WOOD STREET EXTENSION OVER MERRIMACK RIVER AND MBTA/CSX RAILROADBridge ReplacementDesign 
613109CHELMSFORD- LOWELL- DECK REPLACEMENT, C-08-030 (2JG) AND L-15-065 (2H2, 2H3), LOWELL CONNECTOR (NB/SB) AND LOWELL CONNECTOR B-11 OVER I-495Bridge Deck ReplacementDesign
601716LOWELL- BRIDGE REHABILITATION, BR# L-15-029 JEFFERSON STREET OVER CANALBridge RehabilitationDesign